Saturday, November 23rd, 2024

Beni-Jomsom road obstructed


02 July 2022  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MYAGDI: Beni-Jomson road connecting Mustang to national highway via northern part of Myagdi has been obstructed from this morning.

Landslide occurred at Kavrebhir, the bordering of Myagdi and Mustang, obstructed the vehicular movement along the 76-kilometers Beni-Jomson road section.

Supervisor of Beni-Jomsom-Korala road project, Indra Singh Sherchan, said a big-size rock has fallen on the road on the road, causing vehicular movement obstruction.

He shared, “Preparation is underway to resume the traffic. They have proposed the District Administration Office through the road project to break the rock using explosive materials as the attempt to remove the rock by using a dozer went in vain.”

According to the District Administration Office, a team of the Nepali Army with explosive materials has been sent to Kavrebhir for the same.

Vehicles plying towards Mustang from Beni and from Mustang to Myagdi have been stranded following the road obstruction.

Publish Date : 02 July 2022 12:37 PM

Jumla district declared fully literate

JUMLA: All eight local levels in Jumla district have been

Climbing Dharahara now requires a fee starting Nov 24

KATHMANDU: Effective November 24, a fee of Rs 200 per

Elderly killed in rhino attack

NAWALPARASI: An elderly died in a rhino attack in Nawalparasi

Chinese Ambassador Song meets with RPP Chair Lingden

KATHMANDU: Chinese Ambassador to Nepal, Chen Song met with Rastriya

Speaker Ghimire arrives in Cambodia

PHNOM PENH: Speaker Devraj Ghimire has arrived in Cambodia, leading