Sunday, May 3rd, 2026

Beni-Jomsom road obstructed



MYAGDI: Beni-Jomson road connecting Mustang to national highway via northern part of Myagdi has been obstructed from this morning.

Landslide occurred at Kavrebhir, the bordering of Myagdi and Mustang, obstructed the vehicular movement along the 76-kilometers Beni-Jomson road section.

Supervisor of Beni-Jomsom-Korala road project, Indra Singh Sherchan, said a big-size rock has fallen on the road on the road, causing vehicular movement obstruction.

He shared, “Preparation is underway to resume the traffic. They have proposed the District Administration Office through the road project to break the rock using explosive materials as the attempt to remove the rock by using a dozer went in vain.”

According to the District Administration Office, a team of the Nepali Army with explosive materials has been sent to Kavrebhir for the same.

Vehicles plying towards Mustang from Beni and from Mustang to Myagdi have been stranded following the road obstruction.

Publish Date : 02 July 2022 12:37 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Over 1,100 posts to fall vacant after ordinance

KATHMANDU: More than 1,100 positions across around 150 public bodies

Demolished temples in Balkhu not of archaeological significance, says Department of Archaeology

KATHMANDU: The Department of Archaeology has clarified that temples and

U.S. special envoy Sergio Gor concludes Nepal visit

KATHMANDU: U.S. Special Envoy for South and Central Asia Sergio

Postal Highway blocked as flood swept away Kamala River diversion

SIRAHA: A temporary diversion built in the Kamala River, which