Saturday, December 21st, 2024

Landslide blocks Besisahar-Chame road


01 August 2022  

Time taken to read : < 1 Minute


  • A
  • A
  • A

BESISAHAR: The Besisahar-Chame road, the gateway to Manang district has been blocked for traffic after the landslide washed away the road. The road was washed away by a landslide triggered by continuous rain since Sunday night.

The Besisahar-Chame road was blocked after the flood caused damage to toad in Ghoptevir of Manang and in Marsyangdi Rural Municipality-4 Rambazar of Lamjung, according to Sub-engineer Suman Adhikari of the Dumre-Besinshahr-Chame road project office. The road remains blocked since this morning.

Chief District Officer Ravindra Prasad Acharya said that the flood that occurred in Kholsi near the headquarters Chame washed away the Koto section of the Besisahar-Chame road. Work is being done to open the road.

Meanwhile, CDO Acharya has urged the residents of the district to remain alert and cautious as it is raining continuously.

Publish Date : 01 August 2022 19:50 PM

CPN-Maoist Chair Dahal congratulates NPL champions

KATHMANDU: Pushpa Kamal Dahal ‘Prachanda,’ Chair of the Communist Party

NC-led majority government to further consolidate federalism: Leader Singh

MAKWANPUR: Nepali Congress (NC) leader Prakashman Singh claimed that the

President Paudel congratulates NPL title winner

KATHMANDU: President Ramchandra Paudel has congratulated Janakpur Bolts for winning

Socioeconomic development taking place gradually: PM Oli

SUNSARI: Prime Minister KP Sharma Oli has said that several

‘Lumbini circuit to be developed for tourism promotion’

LUMBINI: Chief Minister of Lumbini Province Chet Narayan Acharya has