Thursday, November 21st, 2024

Power generation from Lower Modi hydel project suspended for three weeks


24 September 2021  

Time taken to read : 2 Minute


  • A
  • A
  • A

PARBAT: The Lower Modi-1 Hydropower Project in Parbat district that was damaged by flood on September 2 is yet to begin power generation.

The project officials said that immediate resumption of the power generation from the project is unlikely as the damage from the flood is quite huge in scale. Project’s canal, dam, share wall, slab and other structures have witnessed damages after the flood.

However, powerhouse of the project is unaffected from the flood but it could take more time to supply water from the canal.
Likewise, a tower of the transmission line of 132 KV capacity linking the powerhouse to Modi substation is collapsed in the disaster, making the power resumption more tough. The project said that around Rs 15 million is likely to cost for the development of a tower.

United Modi Hydropower Company’s Managing Director Upendra Gautam said that the company has suffered daily loss of Rs 1 million after the suspension in power generation while adding that total damage was evaluated Rs 50 million plus.

Publish Date : 24 September 2021 10:33 AM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

People’s representatives should be responsible for public service: Prachanda

DAMAULI: CPN (Maoist Centre) Chairperson and former Prime Minister Pushpa

Minister Yadav directs smooth distribution of Melamchi Water in Kathmandu

KATHMANDU: Minister for Water Supply, Pradip Yadav, has instructed daily

NC to discuss current economic situation and way forward

KATHMANDU: The Nepali Congress is to hold a discussion on

Private medical colleges, govt. hospitals directed to make service fees public

KATHMANDU: The Ministry of Health and Population has asked the