Friday, December 19th, 2025

Flood causes cracks in East-West Highway in Rupandehi

Transportation blocked in the highway



BUTWAL: Traffic has been disrupted in Rupandehi section of the East-West Highway due to flooding induced by continuous rainfall that started since Monday.

According to sources, the diversion road near Charange on the Butwal-Devadaha road section has been washed away by the flood.

The road has been blocked since 12:30 pm today. Vehicles have been stranded on both sides of the road after the road was washed away.

During the expansion of the highway, a diversion road was built to ease transportation for the four-lane bridge  under-construction.

Publish Date : 15 June 2021 17:57 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

WADA names India world’s worst doping offender for third straight year

KATHMANDU: India has topped the global list of doping offenders

Oli wins as party chair but loses as central committee member

KATHMANDU: The results of the 11th general convention of the

Cambodia–Nepal B2B Business Interaction Program 2026 in the offing

KATHMANDU: A Cambodia–Nepal B2B Business Interaction Program 2026 is set

Dr. Naresh Subedi appointed NTNC Secretary

KATHMANDU: Dr. Naresh Subedi has been appointed as the Secretary