Thursday, November 21st, 2024

Kodari section of Araniko Highway resumes


14 July 2021  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KODARI: Vehicular movement has resumed on the Kodari road section along the Araniko Highway since Tuesday. The rain-triggered floods and landslides had disrupted the road traffic.

The flood-fed Bhotekoshi on last June 19 had eroded the Kodari road of Tatopani – the main trade transit to China from Sindhupalchowk.

Likewise, the landslides had also caused damages to the 50-meter section of the road.

A temporary track has been placed to open the disrupted road traffic, said Engineer of Division Road Office, Dolakha, Govinda Dumari. —

Publish Date : 14 July 2021 13:25 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

People’s representatives should be responsible for public service: Prachanda

DAMAULI: CPN (Maoist Centre) Chairperson and former Prime Minister Pushpa

Minister Yadav directs smooth distribution of Melamchi Water in Kathmandu

KATHMANDU: Minister for Water Supply, Pradip Yadav, has instructed daily

NC to discuss current economic situation and way forward

KATHMANDU: The Nepali Congress is to hold a discussion on

Private medical colleges, govt. hospitals directed to make service fees public

KATHMANDU: The Ministry of Health and Population has asked the