Saturday, September 12th, 2026

Kodari section of Araniko Highway resumes



KODARI: Vehicular movement has resumed on the Kodari road section along the Araniko Highway since Tuesday. The rain-triggered floods and landslides had disrupted the road traffic.

The flood-fed Bhotekoshi on last June 19 had eroded the Kodari road of Tatopani – the main trade transit to China from Sindhupalchowk.

Likewise, the landslides had also caused damages to the 50-meter section of the road.

A temporary track has been placed to open the disrupted road traffic, said Engineer of Division Road Office, Dolakha, Govinda Dumari. —

Publish Date : 14 July 2021 13:25 PM

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process

Foreign currency exchange rates fixed for today

KATHMANDU: Nepal Rastra Bank has fixed the foreign currency exchange