Monday, December 22nd, 2025

Petroleum pipeline to be extended to Chitwan



BIRGUNJ: After the success of the Motihari-Amlekhgunj petroleum pipeline project, the government is extending the pipeline from Amlekhgunj to Lothar of Chitwan.

A study is now underway to materialize the 69-kilometers pipeline from Amlekhgunj to Chitwan, said Nepal coordinator in the Nepal-India Pipeline Joint Study Group, Birendra Goit.

The study will help to identify the method of extending the pipeline and the estimated cost.

A joint task force to be formed following an understanding between the governments of Nepal and India will develop the detailed project report.

Lothar in Chitwan will have a storage capacity of 100,000 kilolitres of petroleum.

The pipeline from Motihari of India to Amlekhgunj depot of Nepal Oil Corporation is being used to transport diesel and a study is now being carried to start transportation of petrol as well, using the same pipeline, said Chief of NOC Province-2, Bharat Regmi. For this, two petrol tanks of 4.2 million liter capacity each are being constructed at the Amlekhgunj depot for storing petrol.

Petrol can be supplied at the rate of 300,000 to 400,000 liters per hour using the pipeline. Transportation of fuel using the pipeline has saved transportation costs, ended technical loss, and helps maintain quality and control leakage, Regmi said.

Publish Date : 10 January 2021 11:45 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Government to register and list online television channels

KATHMANDU: The government of Nepal has decided to register and

PM Karki holds meeting with RSP chair Rabi Lamichhane

KATHMANDU: Prime Minister Sushila Karki and Rastriya Swatantra Party (RSP)

Equipment of Jumla’s Tila Micro Hydropower Project abandoned

JUMLA: Electrical equipment worth crores of rupees has been abandoned

100 days of govt: Hope unfulfilled, elections uncertain

KATHMANDU: The government led by Prime Minister (PM) Sushila Karki,