Tuesday, January 7th, 2025

Traffic resumes on Karnali corridor road


05 November 2021  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KARNALI: The Karnali corridor road which was obstructed due to landslide at different sections has resumed.

The landslide debris that had deposited on the road at Bar, Gobrebhid, Kholibazaar and Simkhet along the Lalighat of Kalikot district to Sallisalla of Humla has been removed and traffic resumed on this section of the corridor highway.

The landslide had deposited huge boulders at different places along the roadway. The Nepali Army had worked continuously to open the road.

Nepali Army Major, Prem Karki said the road has been opened after 15 days since it got blocked.

The Kalikot, Bajura and Humla folks faced much inconvenience due to the disruption of vehicular traffic.

Karnali corridor roadway was obstructed due to the landslide triggered by incessant rains for four days since October 17.

Publish Date : 05 November 2021 15:24 PM

13 injured in Nepal following Tibet earthquake

KATHMANDU: A total of 13 people have been injured across

Two hydropower projects get investment worth Rs 26 billion

KATHMANDU: With the increasing investment in various hydropower projects, banks

PM Oli awards international medalists from various sports competitions

KATHMANDU: Prime Minister KP Sharma Oli has awarded medals to

Health AI conference HAICon 2025 kicks off in Kathmandu

KATHMANDU: The Health AI for All Conference (HAI Con) 2025

Nepal Police arrest 53 people in online gambling raid

KATHMANDU: The Central Investigation Bureau (CIB) of Nepal Police has