Saturday, September 12th, 2026

One-way traffic resumes in BP Highway



BANEPA: The BP highway has been resumed for traffic after the obstruction due to floods in Mamti river in Roshi rural municipality was cleared.

One-way traffic has been resumed at the joint initiative of police, the rural municipality, road project and locals.

The road section in the border of ward nos 11 and 12 of the rural municipality remained closed since 12:00 midnight on Friday and resumed at 2:30 pm on Saturday, police inspector at Area Police Office, Mangaltar Sherkhar Khadka said.

A dozer was used to clear the sludge gathered on the road and hence one-way traffic was resumed. A large number of vehicles and their passengers had remained stranded as a result.

Publish Date : 04 July 2021 11:15 AM

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process