Wednesday, February 5th, 2025

Two-way traffic resumes in Gaidnakot-based highway


02 September 2021  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: Two-way traffic has resumed along the East-West Highway that was obstructed after the monsoon-induced flood took away a diversion in Gaindakot Municipality-23 of Nawalpur.

The highway that was disrupted since last Thursday has come into operation after seven days. The road traffic had come to a halt when a diversion constructed in course of the East-West Highway widening drive was taken away by a flood.

Through continuous efforts were made to bring back the highway to complete an operation it was not materialized due to muddy surface with incessant rain.

Two-way traffic has come to resumption through the newly-constructed diversion after the rainfall stops.

Information Officer of District Traffic Police Office Padam Badu informed that the highway operation has resumed since Wednesday evening after carrying out necessary maintenance.

Publish Date : 02 September 2021 12:19 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

OAG forms probe committee

KATHMANDU: An investigation committee has been formed to study the

Ordinance for good governance and development: Minister Gurung

BHAKTAPUR: Minister for Communications and Information Technology Prithvi Subba Gurung

PM Oli inquires about progress of Kathmandu-Tarai expressway

KATHMANDU: Prime Minister KP Sharma Oli has inquired about the

Upendra Yadav undecided amid ordinance tug of war

KATHMANDU: Janata Samajbadi Party Nepal (JSPN) Chair Upendra Yadav has