Saturday, September 12th, 2026

Two-way traffic resumes in Gaidnakot-based highway



KATHMANDU: Two-way traffic has resumed along the East-West Highway that was obstructed after the monsoon-induced flood took away a diversion in Gaindakot Municipality-23 of Nawalpur.

The highway that was disrupted since last Thursday has come into operation after seven days. The road traffic had come to a halt when a diversion constructed in course of the East-West Highway widening drive was taken away by a flood.

Through continuous efforts were made to bring back the highway to complete an operation it was not materialized due to muddy surface with incessant rain.

Two-way traffic has come to resumption through the newly-constructed diversion after the rainfall stops.

Information Officer of District Traffic Police Office Padam Badu informed that the highway operation has resumed since Wednesday evening after carrying out necessary maintenance.

Publish Date : 02 September 2021 12:19 PM

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process