Sunday, April 26th, 2026

Hetauda Cement Industry resumes operation



HETAUDA: The Hetauda Cement Industry remained closed for three weeks following the prohibitory order in the wake of the spread of coronavirus has resumed operation today.

General Manager Prem Shankar Singh informed that the industry was resumed with the permission of local administration.

He further said there were adequate human resources and raw materials for cement production. However, the production is not on the full scale- only 9,000 sacks of cement are planned for everyday production.

The industry was not operated in full scale because of the prohibitory order imposed in various districts including the Kathmandu Valley and disruption on construction activities. The disruption of construction activities obviously affected the sales and distribution of the cement.

Similarly, a tender was issued for coal citing the possible shortage. In the first phase of the nationwide lockdown, the industry was however able to sell nearly half-million sacks of cement.

The industry was closed for a time and again due to machinery dysfunction last year. It resulted in a huge loss. It is said the industry spent a huge amount to repair the old machines.

The industry administration said investment cost was higher than the production because of old machines.

RSS

Publish Date : 30 August 2020 22:10 PM

Cloudy skies and scattered rain expected across Nepal

KATHMANDU: A mix of westerly and local wind systems is

Trump calls off US officials’ Pakistan visit for Iran war talks

WASHINGTON DC: US President Donald Trump has scrapped a planned

422 disaster incidents reported in 12 days

KATHMANDU: A total of 422 disaster-related incidents have been recorded

NRB sets foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has set the foreign exchange

Sudurpaschim Assembly to convene budget session on April 30

SUDURPASCHIM: Province Chief Nazir Miya has summoned the eighth (budget)