Tuesday, January 21st, 2025

Obstructed Bhimdutta Highway resumes


04 January 2020  

Time taken to read : < 1 Minute


  • A
  • A
  • A

DOTI: Traffic along the Bhimdutta Highway obstructed since Friday evening due to snowfall has resumed.

The highway links seven hilly districts of the Sudurpaschim Province. The highway has resumed after 12 hours.

Vehicular movement on the highway connecting Dadeldhura, Baitadi, Bajhang, Darchula, Achham, Bajura and Doti was completely halted due to heavy snowfall in the high hilly and mountainous districts since Friday.

Hundreds of passengers heading to various destinations in those districts were stranded due to this.

Meanwhile, the ADSL and landline telephone service of Nepal Telecom has been disrupted in the hill districts of the Farwest province including in Doti due to the heavy snowfall.

Publish Date : 04 January 2020 20:20 PM

Nepal Micro Insurance opens IPO for overseas Nepali workers

KATHMANDU: Nepal Micro Insurance Limited has opened the sale of its

Setback for UML in Achham as 1,081 cadres join Bhim Rawal’s campaign

KATHMANDU: A total of 1,081 CPN-UML party cadres from Achham

Dharan Mayor enters Singha Durbar empty-handed after police confiscate empty gagri (a water pot) 

KATHMANDU:  Mayor Harka Sampang entered Singha Durbar on Tuesday to

No exports from 10 out of 28 customs points in Nepal

KATHMANDU: Ten out of Nepal’s 28 operational customs points for

President announces winter session of parliament on January 31

KATHMANDU: President Ram Chandra Paudel has called the winter session