Monday, December 22nd, 2025

1.25 MW solar energy added to national grid



KATHMANDU: The national transmission system has received 1.25 megawatt more solar energy.

The power generated by Nepal Electricity Authority (NEA) in Nuwakot was linked to the national grid, the NEA officials said.

Since the battery is not fixed, the solar plant generates power only when there is the sunshine.

With installed capacity of 25 megawatt, this is the largest solar plant project in the country.

NEA’s Executive Director Kulman Ghising said 10 megawatt more energy would be added to the national grid within one and a half month.

However, remaining other IS likely to consume some more time since the NEA is awaiting the approval of initial environmental examination (IEE) report.

The NEA was supposed to supply the power some 40 days ago but could not materialize due to lockdown, Ghising said.

He viewed that the move to generate solar power has helped NEA in source diversification of energy.

(RSS)

Publish Date : 04 June 2020 21:54 PM

Reminiscing last week: Political consolidation, economic contrasts

KATHMANDU: Last week’s events in Nepal revealed a country moving

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Cold morning grips Kathmandu

KATHMANDU: The Kathmandu Valley experienced a noticeable rise in overnight

Indian national arrested with marijuana

KATHMANDU: An Indian national has been arrested at Tribhuvan International

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has published the official foreign