Monday, June 8th, 2026

Vehicles start plying across Arunkhola bridge after renovation



NAWALPARASI: Vehicles have started plying across the bridge over the Arunkhola river after the damaged part of the bridge was rebuilt.

The vehicles heading to east and west were crossing the rive through a diversion road after the bridge broke down on August 14.

The bridge located in Madhyabindu Municipality in Nawalparasi district caved in for around two meters down at one point after it was rammed by a truck.

 

Publish Date : 27 August 2019 00:24 AM

Minister Shrestha instructs NEA to immediately collect electricity dues

KATHMANDU: The Ministry of Energy, Water Resources and Irrigation has

Japanese Ambassador Maeda calls on Foreign Minister Khanal

KATHMANDU: Japanese Ambassador to Nepal Maeda Toru paid a courtesy

Udyapur Cement Industry in deep financial crisis, production stuck in warehouses

KATHMANDU: The state-owned Udyapur Cement Industry has plunged into a

Parliamentary panel directs govt. to resolve border dispute between Humla and Bajura

KATHMANDU: The Federalism Strengthening and National Concern Committee of the

Nagdhunga tunnel nearing operation, final preparations underway

KATHMANDU: The Nagdhunga–Sisnekhola tunnel project is in its final stage