Tuesday, January 20th, 2026

Pipeline and fuel storage project to cost around Rs 41 bln



KATHMANDU: A preliminary investigation has shown that around Rs 41 billion is required for the construction of oil storage and laying pipelines of petroleum products and liquefied petroleum gas (LPG).

A study made by Nepal Oli Corporation (NOC) in collaboration with the Institute of Engineering (IoE), Pulchowk , has said that the estimated cost of six four pipelines and six oil storage will cost Rs 41 billion 144 million ,500 thousand.

NOC, the state oil monopoly,  is planning to built oil storage that will hold 270 thousand kiloliters of petroleum products and 80 thousand metric tons of LPG.

Publish Date : 25 April 2019 07:13 AM

Rabi Lamichhane reacts after Parsa court sets Rs 10 million bail in cooperative fraud case

KATHMANDU: The Parsa District Court has ordered the release of

Leaders denied tickets by Oli campaign for UML candidates

KATHMANDU: Leaders who were denied election tickets after challenging CPN-UML

Nepali Congress finalizes candidates for all 10 constituencies in Kathmandu

KATHMANADU: The Nepali Congress has finalized its candidates for all

NC row: SC refuses interim order in case against Gagan Thapa

KATHMANDU: The Supreme Court (SC) has refused to grant an

Kanchanpur administration directs surrender of weapons

KANCHANPUR: The District Administration Office, Kanchanpur, has instructed all individuals