Friday, January 16th, 2026

Transport resumption brings cheers to Karnali locals



BAJURA: Transportation is beginning at Bajura section of the Karnali corridor. The District Administration Office here informed that the 35-km road from Laifu to Lebdi, which is a part of the Karnali corridor, is coming into operation on Thursday.

The locals here have been elated after news of the transportation along the local roadway. The roadway also benefits the people from Humla and Mugu districts.

The Nepal Army has been constructing the 285 km long corridor.

Publish Date : 21 March 2019 09:36 AM

Fog expected in Terai; clear skies elsewhere today

KATHMANDU: The Department of Hydrology and Meteorology has reported calm

Prioritizing Early Warning Systems for a Resilient Nepal

‘Nepalko Mahabhukampa’, published by Brahma Shumsher Jung Bahadur Rana in

Kathmandu’s morning temperature climbs slightly

KATHMANDU: Kathmandu’s minimum temperature has increased for the second consecutive

Today’s foreign currency exchange rates

KAHTMANDU: Nepal Rastra Bank has fixed the foreign exchange rates

Neither bridge nor leader: Shekhar Koirala’s role in NC split

KATHMANDU: A four-month-long tug-of-war between the Nepali Congress (NC), left largely