Friday, September 20th, 2024

East-West Highway blocked in Arunkhola as diversion swept away


19 August 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KAWASOTI: The East-West Highway has remained blocked for vehicular transport for 24 hours in Arunkhola area in Nawalparasi district after a bridge over the river got collapsed.

A diversion was being used for traffic along the road section but it was swept away by the floods occurred in the river.

According to District Police Office Nawalaparasi, they were facing difficulties to reconstruct the diversion due to the swollen river.

The police have further urged to take alternative way for the passengers and vehicle operators to be along the Narayanghad-Butwal road section.

Publish Date : 19 August 2019 18:30 PM

Doctors not allowed to work in private clinics during duty hour: Health Minister

CHITWAN: Health and Population Minister Pradip Paudel has said that

UML Senior Vice chair Pokharel assigned with acting party chair’s responsibility

KATHMANDU: CPN-UML Chairman KP Oli has assigned the responsibility of

Federal Parliament Secretariat unveils 1,124-page report on Misappropriation of Cooperative Funds

KATHMANDU: The report prepared by the Parliamentary Special Investigation Committee

DPM Singh assigned responsibility of Acting PM

KATHMANDU: President Ram Chandra Paudel has assigned Deputy Prime Minister

Koshi CM Karki pledges commitment to democratic values

KATHMANDU: Since the promulgation of the Constitution in 2015, Nepal