Tuesday, April 7th, 2026

PM, Energy Minister to inaugurate Trishuli III ‘A’



KATHMANDU: Prime Minister KP Oli and Minister for Energy, Water Resources and Irrigation, Barshaman Pun, are scheduled to jointly inaugurate the Upper Trishuli III’A’ hydropower project today.

The Nepal Electricity Authority (NEA)-developed project took one decade to get completed.

The regular power production from the 60-megawatt capacity project had begun some eight months back. However, the inaugural ceremony is taking place on Monday, according to the NEA.

While Prime Minister Oli will inaugurate it from the ‘Action Room’ based in the Office of the Prime Minister, Minister Pun will be present physically at Simle, the project site based at Kispang rural municipality-5.

Publish Date : 18 November 2019 07:58 AM

Seven tourists die of altitude sickness in seven months in Mustang

MUSTANG: Seven tourists have died from high-altitude sickness over the

Bagmati govt instructs hospitals to provide 10% beds free for needy

BHAKTAPUR: The Bagmati Province Ministry of Health has directed all

Blacktopping work begins on Dhulikhel–Khawa road section

KATHMANDU: Blacktopping work has begun on the Dhulikhel–Khawa section of

Trump warns of dire consequences as Iran deadline looms

WASHINGTON DC: US President Donald Trump has issued a stark

Health Minister Mehta says Constitution guarantees free basic healthcare to all citizens

KATHMANDU: Minister for Health and Population Nisha Mehta has said