Saturday, March 15th, 2025

Dhangadhi Airport to resume full operation from Dec 17


14 December 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

DHANGADHI: Maintenance of Dhangadhi Airport that has been partially closed for some weeks has been completed by 75 percent.

The airport has been partially closed since November 17 for runway overlay and expansion.

According to airport Chief Tej Bahadur Budhathoki, 75 percent of the work has been completed and the airport will resume full operation from December 17.

Flights have been barred from 3 pm in the afternoon till 7 am next day for runway overlay and widening.

According to the Civil Aviation Authority of Nepal (CAAN), the airport has a length of 1,800 meters and is 60 meters wide. The runway is being widened by two meters on both sides.

Publish Date : 14 December 2019 21:07 PM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Today’s foreign currency exchange rates

KATHMANDU: The Nepal Rastra Bank has released the foreign currency

Socialist Front interacting with civil society on political situation

KATHMANDU: The Socialist Front (Samajwadi Morcha) Nepal is set to

NEA announces power cuts in several areas today

KATHMANDU: The Nepal Electricity Authority (NEA) has announced scheduled power

Durga Prasai challenges RPP to resign from Parliament and join movement

KATHMANDU: Durga Prasai, a prominent medical entrepreneur and activist spearheading