Sunday, September 29th, 2024

Upper Trishuli 3 A to start test transmission Sunday


04 May 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: The Upper Trishuli 3 A Hydropower Project is to go for test transmission from Sunday.

According to the Nepal Electricity Authority (NEA), the test transmission would be undertaken along the transmission line from Kispang rural municipality of Nuwakot to Matatirtha of Kathmandu from Sunday.

The NEA has also cautioned people not to go to the periphery of 15-20 meters from the transmission tower during the test operation. In order to avert possible electrical accidents, the NEA has called for the public to adopt safety measures in the stipulated area.

Publish Date : 04 May 2019 22:20 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Ministry of Education urges three-day school closure

KATHMANDU: The government has instructed local authorities to close schools

Minister Rana urges G77 and China to support LDCs in addressing global challenges

KATHMANDU: Minister for Foreign Affairs Dr. Arzu Rana has called

Govt to immediately resume obstructed roads, provide free treatment to injured

KATHMANDU: The government has decided to immediately open the roads

President expresses concerns over disaster-induced loss and damage

KATHMANDU: President Ram Chandra Paudel has expressed concern and grief