Monday, December 22nd, 2025

Upper Trishuli 3 A to start test transmission Sunday



KATHMANDU: The Upper Trishuli 3 A Hydropower Project is to go for test transmission from Sunday.

According to the Nepal Electricity Authority (NEA), the test transmission would be undertaken along the transmission line from Kispang rural municipality of Nuwakot to Matatirtha of Kathmandu from Sunday.

The NEA has also cautioned people not to go to the periphery of 15-20 meters from the transmission tower during the test operation. In order to avert possible electrical accidents, the NEA has called for the public to adopt safety measures in the stipulated area.

Publish Date : 04 May 2019 22:20 PM

Election in 73 days: EC sets inclusive group quotas for Proportional Representation

KATHMANDU: With just 73 days remaining until the House of

Protein can be easily met through traditional Nepali diets

KATHMANDU: The human body needs to produce many internal hormones

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Government to register and list online television channels

KATHMANDU: The government of Nepal has decided to register and

PM Karki holds meeting with RSP chair Rabi Lamichhane

KATHMANDU: Prime Minister Sushila Karki and Rastriya Swatantra Party (RSP)