Tuesday, June 16th, 2026

Upper Trishuli 3 A to start test transmission Sunday



KATHMANDU: The Upper Trishuli 3 A Hydropower Project is to go for test transmission from Sunday.

According to the Nepal Electricity Authority (NEA), the test transmission would be undertaken along the transmission line from Kispang rural municipality of Nuwakot to Matatirtha of Kathmandu from Sunday.

The NEA has also cautioned people not to go to the periphery of 15-20 meters from the transmission tower during the test operation. In order to avert possible electrical accidents, the NEA has called for the public to adopt safety measures in the stipulated area.

Publish Date : 04 May 2019 22:20 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Cardamom festival to be held in Taplejung

TAPLEJUNG: A provincial-level Cardamom Festival is going to be held

Foreign Minister Khanal meets Chinese official Liu Haixing in Beijing, discusses strengthening ties

KATHMANDU: Foreign Minister Shishir Khanal held talks with Liu Haixing,

No factional differences within UML at present: Shankar Pokharel

KATHMANDU: CPN-UML General Secretary Shankar Pokharel has claimed that there

Budget focused on long-term economic reform rather than short-term popularity: Finance Minister

KATHMANDU: Finance Minister Swarnim Wagle has said the budget for