Monday, November 16th, 2026

Upper Trishuli 3 A to start test transmission Sunday



KATHMANDU: The Upper Trishuli 3 A Hydropower Project is to go for test transmission from Sunday.

According to the Nepal Electricity Authority (NEA), the test transmission would be undertaken along the transmission line from Kispang rural municipality of Nuwakot to Matatirtha of Kathmandu from Sunday.

The NEA has also cautioned people not to go to the periphery of 15-20 meters from the transmission tower during the test operation. In order to avert possible electrical accidents, the NEA has called for the public to adopt safety measures in the stipulated area.

Publish Date : 04 May 2019 22:20 PM

Nepal suspends 40MW electricity exports to Bangladesh as domestic supply tightens

KATHMANDU: Nepal has stopped exporting 40 megawatts of electricity to

Finance Minister Wagle calls for stronger recovery of bad loans

KATHMANDU: Finance Minister Dr Swarnim Wagle has urged Nepal Bank

Death toll in Rara road accident rises to four

MUGU: The death toll in Sunday’s road accident near Rara

Youth killed in motorcycle accident in Dhanusha, rider arrested

JANAKPURDHAM: A 26-year-old youth died after being hit by a

Indian Ambassador Dalela pays courtesy call on Foreign Minister Khanal

KATHMANDU: Newly appointed Indian Ambassador to Nepal, Sudhakar Dalela, paid