Tuesday, May 12th, 2026

Upper Trishuli 3 A to start test transmission Sunday



KATHMANDU: The Upper Trishuli 3 A Hydropower Project is to go for test transmission from Sunday.

According to the Nepal Electricity Authority (NEA), the test transmission would be undertaken along the transmission line from Kispang rural municipality of Nuwakot to Matatirtha of Kathmandu from Sunday.

The NEA has also cautioned people not to go to the periphery of 15-20 meters from the transmission tower during the test operation. In order to avert possible electrical accidents, the NEA has called for the public to adopt safety measures in the stipulated area.

Publish Date : 04 May 2019 22:20 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Over 146,000 students remain non-graded in SEE results

KATHMANDU: More than 146,000 students who appeared in this year’s

Here’s how students can check SEE results

KATHMANDU: The results of the Secondary Education Examination (SEE) have

PMO says PM Balen Shah briefly left Parliament due to health discomfort

KATHMANDU: The secretariat of Prime Minister Balen Shah has clarified

Jagdish Kharel challenges allegations, vows to quit politics if link to Smart Telecom proven

KATHMANDU: Former Minister for Communications and Rastriya Swatantra Party (RSP)