Wednesday, February 4th, 2026

Construction of Gautam Buddha Airport stalled due to lockdown



BUTWAL: Works of the under-construction the Gautam Buddha International Airport have been halted after necessary electrical equipment and skilled workers were stopped abroad due to lockdown.

The project has stated that the remaining works will be completed within two months of the arrival of construction materials and manpower at Bhairahawa, media reports said on Sunday.

Chief of Gautam Buddha Airport Construction Project Prabesh Adhikari said that preparations are being made to make the airport ready for takeoff and landings within two months.

Runway light fixtures and conveyor belts of the baggage handling system are the main equipment left to arrived, while 95 percent of equipment has arrived already.

Even if Nepali technicians can connect equipment like light fixtures, technicians have to come from abroad to connect conveyor belts.

The problem now is to bring the rest of the equipment and workers stopped abroad. For that, international flights and land routes or sea routes need to be open, says the project chief.

Publish Date : 03 May 2020 11:31 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

6,768 girls in Chitwan to receive HPV vaccine to prevent cervical cancer

CHITWAN: A total of 6,768 girls in Chitwan are set

KMC develops integrated attendance system for community schools

KATHMANDU: Kathmandu Metropolitan City (KMC) has developed its own integrated

Jay Trophy Men’s Elite Cup to start on February 20

KATHMANDU: The Cricket Association of Nepal (CAN) has announced that

Sri Lankan Ambassador calls on PM Karki

KATHMANDU: Newly appointed Sri Lankan Ambassador to Nepal, Ruwanthi Delpitiya,