Wednesday, December 25th, 2024

Mugu left out of communications: Rara tourists in trouble


07 January 2020  

Time taken to read : 3 Minute


  • A
  • A
  • A

Publish Date : 07 January 2020 10:25 AM

Rapid pesticide residue analysis lab set up in Dhalkebar

KATHMANDU: A rapid pesticide residue analysis laboratory has been inaugurated

Upper Tamakoshi Hydropower resumes partial operation after flood-induced damages

KATHMANDU: The 456-megawatt Upper Tamakoshi Hydropower Project, severely damaged by

Constitutional amendment process to begin after multi-party discussions: DPM Singh

KATHMANDU: Deputy Prime Minister and Urban Development Minister Prakash Man

Reconstruction of Agam Chhen at Hanuman Dhoka Durbar to begin soon

KATHMANDU: The Department of Archaeology has announced plans to reconstruct

Gold and silver prices down marginally

KATHMANDU: The price of gold and silver witnessed a minor