Saturday, October 31st, 2026

Krishnabhir track opening completed, vehicular movement to resume Thursday



KATHMANDU: The construction of a new track at Krishnabhir along the Nagdhunga-Muglin section of the Prithvi Highway, which was blocked by floods, has been completed.

With the opening of the new track, vehicular movement along the road section is expected to resume fully from Thursday. Prime Minister Balendra Shah’s Secretariat shared a drone view of Krishnabhir, confirming that the track-opening work had been completed.

The road section has remained blocked since August 39, disrupting the supply of food, liquefied petroleum gas (LPG), and fuel to the Kathmandu Valley. With the road now reopened, authorities expect the supply system to gradually return to normal.

Publish Date : 16 September 2026 11:07 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

No one above constitution and democracy: Rabi Lamichhane

KATHMANDU: Drawing a clear line on constitutional supremacy and democratic

RSP to initiate parliamentary process for judicial restructuring

KATHMANDU: The ruling Rastriya Swatantra Party (RSP) is preparing to

Voter roll to be updated using National ID and civil registration data

KATHMANDU: The Election Commission (EC) is preparing to update and

NC calls meeting to draw govt’s attention to pressing issues

KATHMANDU: The main opposition party, Nepali Congress (NC), has called