Monday, March 9th, 2026

Butwal–Narayangadh road section obstructed after rain makes damaged stretch slippery



KATHMANDU: The Butwal–Narayangadh road section has been obstructed after rainfall made a damaged stretch of road slippery in the Daunne area.

The disruption occurred at Daunne in Binayi Triveni Rural Municipality-2 after the road surface at a subsided section became slippery due to rain, causing difficulties for vehicles since Sunday morning.

According to Nawalparasi District Police Office (Bardaghat Susta East), vehicles have been unable to move smoothly since around 10 am.

Superintendent of Police Yubaraj Khadka said around 100 to 150 vehicles have been stranded on both sides of the road.

“Vehicles have faced difficulties moving after the road became slippery around 10 am,” Khadka said, adding that dozens of vehicles remain lined up on both sides of the road.

Authorities said continuous drizzle has made it difficult to immediately reopen the road. Security personnel and the road project team are working to clear the obstruction and resume traffic.

Publish Date : 09 March 2026 11:13 AM

Sudan Gurung of RSP wins Gorkha-1 with wide margin

GORKHA: Sudan Gurung of the Rastriya Swatantra Party (RSP) has

Over 10,000 votes invalid in Dang during House election count

KATHMANDU: More than 10,000 votes have been declared invalid in

Newly elected National Assembly members take oath of office and secrecy

KATHMANDU: Newly elected members of the National Assembly of Nepal

KMC begins box culvert construction over Tukucha stream in Putalisadak–Bagbazar section

KATHMANDU: The Kathmandu Metropolitan City has begun construction of a

EC says all House election processes to conclude by March 19

KATHMANDU: The Election Commission Nepal has said that all remaining