Monday, July 27th, 2026

BP Highway blocked, vehicles diverted to Kathmandu via alternative route



KATHMANDU: With several sections of the BP Highway blocked due to landslides and river erosion, vehicles are being diverted to Kathmandu through alternative routes.

Authorities said the temporary road built along the highway was recently washed away by floods, forcing vehicles to be rerouted through Dolakha Charikot to reach the capital. In Kavre’s Roshi Rural Municipality, sections of the highway were damaged by the Roshi River, while roads in Namobuddha and Dhulikhel areas have also collapsed or been swept away.

As the BP Highway is expected to remain closed for some time, traffic has been redirected through the Khurkot–Manthali–Charikot–Khandichaur route as an alternative connection.

Publish Date : 06 October 2025 15:26 PM

American citizen dies after collapsing while walking in Pokhara

KATHMANDU: A 48-year-old American citizen died while undergoing treatment after

Dr. Govinda KC’s condition worsens as talks with government continue

KATHMANDU: The health condition of hunger-striking Dr. Govinda KC has

Education minister calls for structural reforms to improve higher education

KATHMANDU: Education and Sports Minister Sasmit Pokharel has stressed the

Nagdhunga tunnel project approved at first Cabinet meeting of Jhalanath Khanal government

KATHMANDU: The long-awaited Nagdhunga–Sisnekhola Tunnel was officially inaugurated on Monday,

Govinda KC, government draft eight-point agreement; hunger strike to end only after signing

DHANGADHI: Negotiation teams representing Professor Dr Govinda KC and the