Friday, September 18th, 2026

Culvert replaces suspension bridge in Galkot



BAGLUNG: A culvert has been constructed in Galkot Municipality in Baglung as an alternative to a suspension bridge, providing easier access for small vehicles and pedestrians. Several culverts have now been built across the municipality to improve connectivity.

The new culvert was built after the suspension bridge over the Mulakhola in Narethanti, Galkot-2, was washed away by floods.

The original bridge, destroyed in the floods of 2072 BS, was replaced during the construction of a motorway. Since then, four culverts have been constructed in Narethanti, replacing previously existing suspension bridges.

The culvert was constructed at a cost of Rs. 2 million, targeting residents traveling from Narethanti Bazaar to the upper settlements of the former Narethanti VDC Wards 1, 2, and 3.

According to Galkot Municipality Spokesperson Him Bahadur Bhandari, the new culvert has made travel significantly easier for residents of Chaap, Ramche, Torikhola, and other upper settlements.

This issue was resolved through the construction of a 6.5-meter-long culvert-type bridge, implemented by the Infrastructure Development Office of the Gandaki Province Government in Baglung. The culvert was built by the local community through a Consumers’ Committee with a budget of Rs. 2 million.

Consumers’ Committee Chairman Shree Krishna Bhandari stated that the suspension bridge has been replaced by the culvert on an alternative road to the highway.

In the event of a blockade on the Mid-Hill Highway, the Narethanti–Faparkheti–Chaap rural road will serve as an alternative route, and the culvert ensures year-round vehicular movement.

Chandra Pun, an engineer at the Infrastructure Development Office, confirmed that the short bridge has provided significant relief to the locals.

The former Narethanti VDC is characterized by numerous creeks, gullies, and rivers, prompting the earlier construction of suspension bridges due to the high risk of flooding during the rainy season. Now, with the upgrading of the motor road and the construction of culverts, these suspension bridges are being phased out.

Engineer Pun added that the suspension bridge has become obsolete following the construction of four concrete culvert-type bridges in Narethanti.

The municipality is currently planning to relocate the unused suspension bridges to other areas where they are still needed.

Publish Date : 23 June 2025 09:57 AM

Bhote Koshi floods: 677 transport workers unaccounted for

KATHMANDU: The Nepal Truck Transport Entrepreneurs Federation has reported that

29th memorial day of Ganesh Man Singh being observed today

KATHMANDU: The Nepali Congress, its sister organizations and well-wishers are

US approves USD 24.3 billion sale of 48 F-35 fighter jets to Saudi Arabia

WASHINGTON DC: The US Department of State on Thursday (Local

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Birendrabhakta to continue tongue-piercing ritual

BHAKTAPUR: Birendrabhakta Gaju Shrestha, a 39-year-old resident of Balkumari, Madhyapur