Saturday, June 13th, 2026

Nagdhunga-Naubise road to be partially closed from today



KATHMANDU: Starting today, May 24, the Nagdhunga-Naubise section of the Tribhuvan Highway—the main gateway into Kathmandu—will be partially closed for 16 days.

The Nagdhunga-Muglin Road Project (Eastern Section) has announced that the 1.8-kilometer stretch from Nagdhunga to Pipla Mode will be closed daily from 10:30 am to 3 pm during this period.

Vehicles traveling from Kathmandu to Naubise will be stopped at the Nagdhunga check post, while those coming from Naubise to Kathmandu will be halted at Khanikhola Bazaar.

Motorists are advised to use alternative routes for small and medium vehicles, such as Sitapaila-Ramkot-Dharke road and the Samakhusi-Tokha Chhahare-Trishuli (Bidur)-Galchhi road.

Emergency vehicles, including fire engines, ambulances, and security vehicles, will be allowed to pass through without restriction during the closure.

Publish Date : 24 May 2025 06:17 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Kathmandu hosts high-level meeting on India–Nepal cross-border railway projects

KATHMANDU: A high-level meeting has been held in Kathmandu to

13 arrested with narcotic substances from different parts of Nepal

KATHMANDU: Police have arrested 13 individuals from different parts of

Iran and US say deal closer than ever

TEHRAN: Iranian and US officials said Friday a deal to

Economic Survey for FY 2082/83BS presented in Koshi Province Assembly

BIRATNAGAR: The Economic Survey for ongoing fiscal year 2082/83 BS