Thursday, December 25th, 2025

Hydraulic cable failure strands Chandragiri cable car passengers



KATHMANDU: A hydraulic cable failure at the Chandragiri Cable Car stranded thousands of passengers on Monday, forcing the service to shut down from 2:30 PM.

The disruption left over a thousand visitors stuck at Chandragiri Hills.

According to Metropolitan Police Circle, Thankot, 22 cable car cabins were immobilized. Emergency systems were used to rescue passengers from the lower station, but those at the upper station faced significant delays.

A police official reported that the issue had not been resolved as of Monday evening, with repairs on the broken hydraulic cable still underway.

Publish Date : 30 December 2024 19:35 PM

Balen intensifies talks to forge alternative political force as March 5 election nears

KATHMANDU: With the March 5 House of Representatives election drawing

Bethlehem marks first festive Christmas since Gaza war

BETHLEHEM: Hundreds of worshippers gathered at the Church of the

Preliminary voter list published for National Assembly election

KATHMANDU: The Election Commission has published the preliminary voter list

Gold, silver prices dip after hitting record highs

KATHMANDU: Gold and silver prices declined on Thursday, retreating from

Trade fairs and festivals boost economy and tourism: FNCCI President Dhakal

BANKE: President of the Federation of Nepalese Chambers of Commerce