Sunday, November 24th, 2024

Jomsom-Kagbeni road section blacktopped


27 September 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MYAGDI: A 13-kilometer road from Jomsom to Kagbeni under the national pride project, Kaligandaki Corridor, has been blacktopped.

The road section has been widened to 11 meters. A contract was signed to blacktop the Jomsom-Kagbeni section at a cost of Rs 281.4 million.

Information Officer of Beni-Jomsom-Korala Road Project, Bishnu Chapagain said the blacktopping task has been completed and activities related to road furniture have reached the final phase.

Of the 110-kilometer from Jomsom to Korala check point, 75-kilometer road has been expanded and gravelled.

Ninety-two per cent construction along 25-kilometer Charang-Chhoser section has been completed.

Project Chief Dhurba Kumar Jha shared that road from Jomsom to Korala would be gravelled after completion of the upgrading task of Charang-Chhoser section.

Publish Date : 27 September 2024 21:54 PM

Three hydropower projects completed in Chilime

KATHMANDU: The construction of three hydropower projects in Rasuwa, led

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank has published today’s exchange rates for

Dharahara climbing to cost Rs 200 per person from today

KATHMANDU: Beginning today (November 24), a fee of Rs 200

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Knee surgery performed on 34 patients

KATHMANDU: The Jorpati-based Nepal Orthopedic Hospital has performed knee surgery