Saturday, September 12th, 2026

East-West Highway blocked in Arunkhola as diversion swept away



KAWASOTI: The East-West Highway has remained blocked for vehicular transport for 24 hours in Arunkhola area in Nawalparasi district after a bridge over the river got collapsed.

A diversion was being used for traffic along the road section but it was swept away by the floods occurred in the river.

According to District Police Office Nawalaparasi, they were facing difficulties to reconstruct the diversion due to the swollen river.

The police have further urged to take alternative way for the passengers and vehicle operators to be along the Narayanghad-Butwal road section.

Publish Date : 19 August 2019 18:30 PM

Rain expected in several parts of country today

KATHMANDU: The Weather Forecasting Division has forecast the possibility of

Besisahar-Chame road to remain closed throughout today

LAMJUNG: The Besisahar-Chame road connecting Lamjung and Manang will remain

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of