Friday, November 22nd, 2024

Traffic on Prithvi Highway resumes after seven hours


12 July 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

TANAHU: Traffic on the Prithvi Highway that was disrupted due to a landslide occurred at Ghansikuwa, Byas Municipality-12 has been resumed after seven hours.

The landslide debris on the road was removed using three equipment of the Muglin-Pokhara Road Expansion Project and the road opened for two-way traffic, Deputy Superintendent Deepak Kumar Raya at the District Police Office said.

“It took time to remove the debris as the landslide was huge. Now, the road is fully open for two-way traffic,” he said.

Hospital damaged due to landslip, service suspended Services at the Purandihi Hospital have been affected after a landslide damaged part of the hospital building.

The landslide damaged the lab and the gynecology ward of the hospital building, said Aishwarya Chandra Bhattarai, Chief of the Bhanu Municipality Health Section.

The hospital is providing only the most essential services. The hospital administration said the lab and gynecology services stand fully suspended at present.

Publish Date : 12 July 2024 12:04 PM

Paddy production increases 10 percent in Dang this year

DANG: Paddy production has increased by 10 percent in Dang

North Korea’s troop deployment to Russia jeopardizes China’s balancing act

WASHINGTON DC: Several of Beijing’s leading trading partners are urging

GP Koirala Hospital to begin dialysis service

TANAHU: The GP Koirala National Centre for Respiratory Diseases based

Weather expected to be clear today

KATHMANDU: The Department of Hydrology and Meteorology has reported a

Three youths killed in high-speed motorcycle collision

BIRATNAGAR: Three youths died, and another was seriously injured following