Friday, March 27th, 2026

Landslide obstructs BP Highway



KATHMANDU: Continuous rainfall has triggered a landslide that has blocked the BP Highway.

The landslide occurred at Kamirephad, Sunkoshi Rural Municipality-2, Sindhuli.

Similarly, a landslide in Akarebhir, Golanjor Rural Municipality-6, has blocked the Mid-Hill Highway.

Authorities are currently working to clear the debris.

Due to floods and landslides, 11 highways across the country are completely obstructed.

According to the Department of Roads, 48 highways are partially operational.

The Dumre-Besisahar-Chame Road is blocked in three places, and the North-South Kaligandaki Highway project is obstructed in two locations.

Publish Date : 06 July 2024 08:16 AM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

US President Trump extends pause on strikes against Iranian energy sites by 10 days

WASHINGTON DC: US President Donald Trump has extended a pause

Western system to bring rain across Nepal today

KATHMANDU: The Weather Forecasting Division has reported a partial influence

NRB issues today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has set the foreign exchange

RSP poised to form govt with historic mandate

KATHMANDU: The Rastriya Swatantra Party (RSP) is preparing to form