Saturday, October 5th, 2024

Naubise-Nagdhunga road section to remain closed tonight


04 July 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

DHADING: The Naubise-Nagadhunga road section will remain closed tonight due to the construction of the bridge over the Naubise River along the Highway.

Ishwar Bahadur Rijal, Senior Division Engineer of Nagdhunga-Muglin Road Project (Eastern Section) said that the work will be stopped for five hours from 10:00 PM to 3:00 AM during the night.

“The RCC beam (precast bridge girder) of the bridge is built on the ground outside the bridge. It will have to be lifted by a crane and placed on the pillar on both sides of the bridge”, Rijal said.

Makendra Kumar Mishra, Deputy Superintendent of Police, District Police Office, Dhading stated that the work will be done at the time when there is no traffic (night time) as the traffic will be obstructed when the heavy equipment is being used.

According to Mishra, vehicles other than ambulances and vehicles used by security agencies will be completely stopped.

Publish Date : 04 July 2024 06:44 AM

Road collapse halts Manthali-Kathmandu traffic

KATHMANDU: Traffic along the Manthali-Kathmandu route, which was operational just

Smartphone provided to traffic police for regulating digital license

KATHMANDU: The traffic police has been provided 104 sets of

Flood survivors worried about the risk of epidemic

Lalitpur: Floods in Nakkhu River last week inflicted huge loss

Traffic resumes one-way in Daunne

NAWALPARASI: Traffic in the south of Nawalparasi has resumed one-way