Saturday, July 4th, 2026

Traffic resumes on Besisahar-Chame road



LAMJUNG: The Lamjung section of the Besisahar-Chame road stretch, which has been blocked since Tuesday evening due to landslides triggered by incessant rains at various places, has come into operation.

According to the District Police Office, traffic operation has resumed in the district after landslides occurred at Kharkhare of Lamjung Besisahar -6 and Gopaldanda of Marsyangdi rural municipality-9 were removed this morning.

Police Inspector Thaneshwor Chapai informed that the vehicles came into operation after the landslide debris was removed from the place and water level in the Octopus Falls dropped.

Although the road has been operated in Lamjung section, Manang section is being obstructed.

Vehicular movement has not been resumed so far after the Timang rivulet washed away a wooden bridge at Chame rural municipality-1 on Tuesday night.

Publish Date : 03 July 2024 11:45 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

France face tough tests as World Cup last 16 begins

PHILADELPHIA: France will contend with soaring temperatures as they take

Shekhar Koirala gives NC establishment until July 9 to decide on party unity

KATHMANDU: Nepali Congress leader Shekhar Koirala has given the party’s

Prachanda warns government of protests if ‘wrongdoings’ continue

BUTWAL: Pushpa Kamal Dahal, coordinator of the Nepali Communist Party

Government formed on gimmicks will not last long: Oli

KATHMANDU: KP Sharma Oli, chair of Communist Party of Nepal