Wednesday, September 30th, 2026

Traffic resumes on Prithvi Highway



CHITWAN: The Prithvi Highway, which was obstructed due to a landslide, has been reopened.

Vehicular movement on the highway was blocked after a landslide occurred at the Muglin-Malekhu section between Phisling and Mauwakhola in Ichhakamana Rural Municipality-3 this morning.

Chief of the Area Police Office in Muglin, Police Inspector Nirala Bhandari, reported that two-way traffic has now resumed after removing the landslide debris that had accumulated and blocked the highway.

Vehicles that were stranded have resumed their journeys to their respective destinations with the reopening of the highway.

Publish Date : 17 June 2024 11:40 AM

RSP to reach all municipalities in local election campaign from Oct 6

KATHMANDU: The Rastriya Swatantra Party (RSP) is set to begin

Finance Committee directs govt to introduce Securities Bill

KATHMANDU: The Finance Committee of the Federal Parliament has directed

Efforts underway to drain lake formed after Marsyangdi River blockage

MANANG: Efforts are underway to drain a lake formed after

Nepal elected AIIB vice-chair as Finance Minister Wagle returns home

KATHMANDU: Finance Minister Dr Swarnim Wagle has returned to Nepal

Jennifer Lawrence to star in Zach Cregger’s sci-fi ‘The Flood’

WASHINGTON DC: Actor Jennifer Lawrence will star in Zach Cregger’s