Sunday, September 22nd, 2024

PM Dahal inaugurates Hetauda-Dhalkebar-Inaruwa 400 KV transmission line


14 June 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Prime Minister Pushpa Kamal Dahal inaugurated the Hetauda-Dhalkebar-Inaruwa 400 KV transmission line on Friday.

The inauguration ceremony took place at the Hetauda substation of the transmission line project in Thanabharyang, Hetauda Sub-Metropolitan City-11, Makawanpur.

The event was organized by the Nepal Electricity Authority (NEA).

The 400 KV substation is Nepal’s third-largest of its kind. The transmission line is expected to strengthen and ensure a reliable power transmission system in the country, facilitating uninterrupted energy trade between Nepal and India.

Officials stated that with the completion of the 154-kilometer-long double circuit power grid, up to 4,000 megawatts of power could be supplied through this line.

Additionally, 220 KV and 132/11 KV substations in Thanabharyang, part of the Nepal-India Transmission and Trade Project, were also activated, according to the NEA.

Publish Date : 14 June 2024 13:14 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Eight wards of Chandragiri Municipality declared child labor free

KATHMANDU: Chandragiri municipality has been declaring its wards child-labor-free by

New trekking route to Tilicho Lake in operation

MYAGDI: A new trekking route to the Tilicho Lake has

Maoist Chair Prachanda calls for directly-elected President

KATHMANDU: Maoist Centre Chairman Pushpa Kamal Dahal “Prachanda” has reiterated