Wednesday, September 30th, 2026

Koshi Highway resumes after two days



SANKHUWASABHA: The Koshi Highway obstructed by the dry landslide has resumed after two days.

The highway was blocked in the section of Khandbari-Kimathanka in the district, according to the chief engineer at the North-South Road Office, Sabin Koirala.

Huge stones falling onto the road blocked the traffic, thereby causing sheer inconvenience to the people from the northern belt, Bhotkhola.

The road is linked to Changa and Denda of Tibet.

Similarly, many vehicles to and from Bhotkhola were stranded along the way.

Even an excavator operator was injured while clearing the obstruction on Sunday morning.

Publish Date : 06 February 2024 08:53 AM

Bhotekoshi floods cause over Rs 88.5 million damage to telecommunications sector

KATHMANDU: Information and Communications Minister Dr Bikram Timilsina has said

Damage to suspension bridge linking Dodhara Chandani and Bhimdatta raised in Parliament

KATHMANDU: Rastriya Swatantra Party (RSP) lawmaker Gyanendra Singh Mahata has

NEPSE falls 4.82 points

KATHMANDU: The Nepal Stock Exchange (NEPSE) index fell 4.82 points

PM Shah discusses post-flood rehabilitation with lawmakers from engineering backgrounds

KATHMANDU: Prime Minister (PM) Balendra Shah held a two-hour discussion

RSP to reach all municipalities in local election campaign from Oct 6

KATHMANDU: The Rastriya Swatantra Party (RSP) is set to begin