Sunday, October 4th, 2026

Kaligandaki corridor obstructed



TRIVENI: The Kaligandaki Corridor has been obstructed due to landslides caused by heavy rains.

Deputy Superintendent of Police Bed Bahadur Paudel reported that the Kaligandaki Corridor has been entirely blocked as a result of landslides in the Nawalparasi (Bardghat Susta East) Nawalpur section.

The Kaligandaki Corridor has remained inaccessible since last night due to a landslide in Bulingtar Rural Municipality-1.

DSP Paudel mentioned that immediate vehicle operation is challenging due to the ongoing rain.

With the Kaligandaki Corridor blocked due to landslides, vehicles traveling through this section are currently unable to operate.

This section serves as a vital route connecting Gandakot to Bullingtar in Nawalpur, Boudikali, Rampur in Palpa, Tanahun, Pokhara, Syangja, and other locations.

DSP Paudel further noted that the continuous rainfall has caused damage to rural roads in hilly areas of the district, making traffic conditions increasingly difficult.

Publish Date : 04 October 2023 13:05 PM

CK Raut re-elected Janamat Party Chair

BIRGUNJ: Dr CK Raut has been re-elected president of the

Minister Shrestha inspects 400-kV transmission line at Dhalkebar

DHALKEBAR: Minister for Energy, Water Resources and Irrigation Biraj Bhakta

NC General Convention set to begin in Kathmandu

KATHMANDU: The Nepali Congress’ (NC) 15th General Convention is set

Over 732,000 citizens enrolled in health insurance in Sudurpaschim

SUDURPASCHIM: More than 732,000 people in Sudurpaschim Province have enrolled

Chinese Ambassador arrives in Lomanthang with seven-member team

MUSTANG: Chinese Ambassador to Nepal Zhang Maoming arrived in Lomanthang