Saturday, September 12th, 2026

Two way traffic resumes in Narayangadh-Muglin road section



CHITWAN: The Nagarayangadh-Muglin road section, which was blocked due to landslides on Saturday morning, has resumed transportation again.

This morning the road was blocked by a landslide in the Tuin river. The road, which was blocked since Thursday, was reopened at 7 pm yesterday after 27 hours. However, the landslide debris blocked the road this again morning.

The road has been opened in both directions after the machine brought from the road division Bharatpur removed the landslide that fell on the road section.

The Road Division Office Bharatpur has also requested to drive vehicles with caution as the stone- fall is still likely.

The office has informed that a machine with an operator has been deployed at that location as the road is likely to be blocked due to landslides at any time.

Publish Date : 01 July 2023 10:38 AM

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process