Saturday, September 12th, 2026

Two motorable bridges constructed over Myagdi river



MYAGDI: Two motorable bridges have been constructed over the Myagdi River, connecting Baranja and Arman of Mangala Rural Municipality with the road network.

The Road Division Office, Baglung constructed the two bridges – one linking Matebagar, Babiyachaur, Ward Number 2 and Pok, Ward Number 5 of Mangala Rural Municipality and the next connecting Phaparkhet, Beni Municipality-4 to Pakher of Mangala Rural Municipality-3.

With the construction of the two bridges, Baranja and Arman, the areas with large geography and settlements in the district have been linked with roadway via the Beni-Darbang road, said Yam Roka, the Ward Chair of Mangala Rural Municipality-3.

More than 2,500 households in Baranja and Arman of Mangala Rural Municipality have benefited from the construction of the two bridges, it is said.

The bridge linking Matebagar and Pok is 80 meters long while the one connecting Phaparkhet and Pakher is 117 meters long.

Both bridges are 11 meters wide.

Both bridges have been constructed at a cost of Rs 220 million. The Road Division Office, Baglung had awarded the contract for the construction of the bridges to Lumbini-Prakritik JV.

Publish Date : 26 April 2023 09:06 AM

Rain expected in several parts of country today

KATHMANDU: The Weather Forecasting Division has forecast the possibility of

Besisahar-Chame road to remain closed throughout today

LAMJUNG: The Besisahar-Chame road connecting Lamjung and Manang will remain

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of