Wednesday, December 4th, 2024

Dumre-Besisahar road resumes operation


03 March 2023  

Time taken to read : < 1 Minute


  • A
  • A
  • A

LAMJUNG: The Dumre-Besisahar road section which has been obstructed since last night due to dry landslide has come to regular operation.

With the removal of landslide debris at Besisahar Rural Municipality-1, Udipur Deurali Danda, the obstructed road section has come to operation since this morning.

An alternative road was opened here when landslides recurrently disrupted traffic along the road section last year.

It may be noted that the landslide had demolished a cemented bridge on the road last year.

Police Inspector at the District Police Office, Lamjung, Jagadish Regmi informed that vehicular movement along the road stretch has become smooth after the removal of landslide with the use of dozers.

Publish Date : 03 March 2023 12:01 PM

President Paudel undergoes successful prostate surgery

KATHMANDU: President Ram Chandra Paudel has successfully undergone prostate surgery.

RSP protesters clash with police in Chitwan

CHITWAN: A clash broke out in Chitwan between Rastriya Swatantra

NPL: Kathmandu wins Karnali by 3 wickets

KATHMANDU: The Karnali Yaks suffered their second defeat in the

Nepal and China sign ‘BRI Cooperation Framework’ agreement

KATHMANDU: Nepal and China have signed a framework agreement for

NHRC expresses concern over lack of disabled-friendly infrastructures

KATHMANDU: The National Human Rights Commission (NHRC) has expressed its