Sunday, February 15th, 2026

Dumre-Besisahar road resumes operation



LAMJUNG: The Dumre-Besisahar road section which has been obstructed since last night due to dry landslide has come to regular operation.

With the removal of landslide debris at Besisahar Rural Municipality-1, Udipur Deurali Danda, the obstructed road section has come to operation since this morning.

An alternative road was opened here when landslides recurrently disrupted traffic along the road section last year.

It may be noted that the landslide had demolished a cemented bridge on the road last year.

Police Inspector at the District Police Office, Lamjung, Jagadish Regmi informed that vehicular movement along the road stretch has become smooth after the removal of landslide with the use of dozers.

Publish Date : 03 March 2023 12:01 PM

Kulman Ghising-led Ujyalo Nepal unveils election manifesto

KATHMANDU: The Ujyala Nepal Party, chaired by Kulman Ghising, unveiled

ICC World Cup: Nepal suffers heavy defeat against West Indies

KATHMANDU: Nepal suffered a heavy 9-wicket defeat against the West

Atmosphere of confidence not ready for polls: Oli

JHAPA: CPN-UML Chairman KP Sharma Oli, arriving in Jhapa on

Man dies after scooter hits pedestrian in Gaindakot

NAWALPUR: A pedestrian died after being struck by a scooter

ICC T20: Nepal set 134-run target for West Indies

KATHMANDU: With a fighting half-century from Dipendra Singh Airee, Nepal