Thursday, August 27th, 2026

Beni-Jomsom road blocked



BENI: The Beni-Jomsom road connecting Mustang with the national highway through the northern area of ​​Myagdi has been blocked.

The Myagdi section of the 76 km long road has been blocked due to landslides in various places of Dana in Annapurna rural municipality-3 of Myagdi on Sunday night.

Beni-Jomsom-Korla road project supervisor Indra Singh Sherchan informed that the road was blocked due to landslides in Guithe, Jalathle, Titar, Dana, Rupse areas.

The road has also been blocked due to falling trees in some places.

The road repair has been started by mobilizing the equipment and workers of the road department and the contractor company of the project.

The obstruction of the road has caused problems for the residents, pilgrims and tourists.

Publish Date : 22 August 2022 09:59 AM

Bhotekoshi flood: 28 police personnel missing

KATHMANDU: As many as 28 police personnel stationed at various

Portable mobile towers being sent to flood-hit areas

KATHMANDU: The government is preparing to send generators and solar-powered

All-party meeting underway in Kathmandu over Rasuwa floods

KATHMANDU: An all-party meeting called by Rastriya Swatantra Party (RSP)

Rasuwa floods: Nepali Army rescues 114 flood victims so far

KATHMANDU: The Nepali Army has deployed five helicopters to rescue

Rasuwa floods: 42 injured brought to Kathmandu, nine discharged so far

KATHMANDU: Nine people injured in the Rasuwa floods and brought