Wednesday, March 18th, 2026

Two-way traffic resumes on Narayangadh-Muglin section



MUGLIN: The vehicular movement disrupted in the Narayangadh-Muglin section has resumed two-way. Landslip had disrupted the traffic since Monday midnight.

District Police Office, Chitwan has informed that the road is operational with two-way traffic since this morning.

Similarly, after four days’ efforts, the Anbukhaireni section of Prithvi Highway has been operative two-way. The two-way traffic resumed along the way since Monday evening.
The road was damaged near powerhouse at Anbukhaireni-4.

Earlier, the road was depressed. So, track was opened with inside removal of hill.

Publish Date : 14 June 2022 09:05 AM

NRB issues today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has set the foreign exchange

Head of Finance Department at Prabhu Bank arrested over banking offences

KATHMANDU: The Cyber Bureau of Nepal Police has arrested Dinesh

Motorcyclist killed in collision with tractor in Dang

DANG: A motorcyclist died after a motorcycle (Ra 6 Pa

Can Nepal’s Political Wave Deliver Reform?

Nepal’s political landscape after three decades appears to be entering

Authorities penalize companies over trading irregularities

KATHMANDU: The Department of Commerce, Supplies and Consumer Protection has