Sunday, July 26th, 2026

Vehicular operation allowed on Anbukhaireni-Muglin section at night



DAMAULI: Vehicular operation has been permitted on Abukhaireni-Muglin road section along the Prithvi Highway in Tanahun at night as well.

Vehicular movement was completely closed from 7.00 pm to 5.00 pm since last Friday after the road near power house at Anbukhaireni Rural Municipality-4 was washed away due to heavy rain.

Two-way traffic along the road section has been opened since Sunday. The District Administration Office, Tanahun had banned operation of vehicles during the stated time on Friday and Saturday considering increased risk of travel at night.

Assistant Chief District Officer Kashiram Gaire shared that the operation of light and heavy vehicles was allowed since Sunday evening after maintenance of damaged road section.

The Road Division Office, Damauli had cut down a wall nearby the collapsed section of the road. Until complete road maintenance, only one-way vehicular operation has been allowed along the damaged road section.

However, vehicular movement would remain closed on Yampafant and Ghansikuwa road stretches from 11.00 pm to 4.00 am for the construction of Muglin-Pokhara road section as per the previous notice

Publish Date : 13 June 2022 09:42 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

30 DDC outlets to be operational in Kathmandu Valley by mid-August

KATHMANDU: The Dairy Development Corporation (DDC) is preparing to bring

Man arrested for allegedly sharing MBS exam paper on WhatsApp

KATHMANDU: Police have arrested a man for allegedly sharing the

Two arrested with suspected narcotics in Birgunj

BIRGUNJ: Police have arrested two people on suspicion of possessing

Nagdhunga tunnel, Balambu flyover illuminated ahead of opening

KATHMANDU: The Nagdhunga–Sisnekhola Tunnel and the Balambu Flyover at the