Sunday, December 21st, 2025

PM Deuba to observe Upper Tamakoshi and Khimti hydro projects today



KATHMANDU: Prime Minister Sher Bahadur Deuba is heading to Dolakha district today to observe Upper Tamakoshi hydropower project.

Prime Minister Deuba will make a site visit to take stock of the under-construction hydropower project and direct the contractor company to complete the project on time.

He will then head to Ramechhap to inaugurate sub-station of Khimti hydropower project and then return home today itself, said the Prime Minister’s secretariat.

Upper Tamakoshi has a capacity of 456 MW. According to Nepal Electricity Authority (NEA), Khimti sub-station has a capacity of 220/132 KV.

This is the second largest sub-station to be connected to the central power system, according to NEA.

Upper Tamakoshi and Khimit hydropower projects are close to completion.

Publish Date : 19 March 2022 09:27 AM

Chinese Ambassador Song pays farewell call on Speaker Ghimire

KATHMANDU: Ambassador of the People’s Republic of China to Nepal,

Farmers encouraged by rise in orange production

SUNSARI: Farmers in the eastern hill districts are enthusiastic after

Baglung farmers’ woes: Forced to sell oranges at low prices

BAGLUNG: Rural areas of Baglung are currently awash with oranges,

Gold price drops after recent surge

KATHMANDU: Prices of gold and silver have been fluctuating in

Free eye check-up camp in Ghodaghodi: 75 of 384 people diagnosed with cataracts

KAILALI: A high prevalence of cataracts has been observed in