Friday, March 20th, 2026

Tanahu hydel project to construct another hydropower project



DAMAULI: Tanahu Hydropower Ltd, which is constructing the 140-MW hydropower project at Rishing Rural Municipality-1 in the district, is to construct another hydel project.

The company is going to construct the 104-MW Lower Seti (Tanahu) Hydropower Project. The water for generating power from this project will be received from 140 meters tall concrete dam in the Seti River of Tanahu hydropower project and additional flow of the Madi River.

The company has already received permission for survey of power production.

An agreement was signed on April 12, 2019, for the procurement of consultancy service of detailed engineering design and bidding documents of the project from 3.5 million US Dollars received from Asian Development Bank.

Publish Date : 05 March 2022 07:10 AM

Iran strikes hit Qatar gas sector, disrupting LNG output and raising global concerns

KATHMANDU: Recent attacks attributed to Iran have caused significant damage

PM Sushila Karki visits Janaki Mandir in Janakpurdham

JANAKPURDHAM: Prime Minister Sushila Karki visited the Janaki Mandir was

‘This victory comes with a massive responsibility’

Bipin Acharya has been a key member of the Rastriya

NC central committee meets without Thapa; resignation under discussion

KATHMANDU: The central working committee meeting of the Nepali Congress

Chariot construction begins for Seto Machhindranath Jatra

KATHMANDU: Construction of the chariot for the annual Seto Machhindranath