Tuesday, April 21st, 2026

Removal of landslide debris begins in Rasuwa



RASUWA: Debris of landslide that blocked the Syafrubsi-Rasuwagadhi road section since last Tuesday is being removed now.

The task of road clearance is taking place with support from local administration. Heavy equipment such as excavators are being used to remove the debris since this morning.

According to Chief District Officer of Rasuwa Nawaraj Jaisi, excavators of Division Road Office and Hydropower Project are being used to clear off the road and resume the traffic operations.

Likewise, security personnel have been mobilized to ensure safe mobility of the pedestrians along the landslide-disrupted road.
Technicians informed that it may take two days to remove the landslide debris since the task demands higher level of precaution and safety measures.

With the disruption of highway, the containers on the way to Nepal from China have been stranded off the road in Timure region.

Publish Date : 05 January 2022 14:54 PM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Trump says US will not lift Hormuz blockade until deal is reached with Iran

WASHINGTON DC: US President Donald Trump has stated that the

NRB issues foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has set the foreign exchange

US Assistant Secretary of State Kapur to meet ministers, discuss US support in Nepal

KATHMANDU: Visiting US Assistant Secretary of State for South and

TIA to close for seven hours at night to speed up construction

KATHMANDU: Tribhuvan International Airport (TIA) will remain closed for seven