Thursday, November 21st, 2024

Removal of landslide debris begins in Rasuwa


05 January 2022  

Time taken to read : < 1 Minute


  • A
  • A
  • A

RASUWA: Debris of landslide that blocked the Syafrubsi-Rasuwagadhi road section since last Tuesday is being removed now.

The task of road clearance is taking place with support from local administration. Heavy equipment such as excavators are being used to remove the debris since this morning.

According to Chief District Officer of Rasuwa Nawaraj Jaisi, excavators of Division Road Office and Hydropower Project are being used to clear off the road and resume the traffic operations.

Likewise, security personnel have been mobilized to ensure safe mobility of the pedestrians along the landslide-disrupted road.
Technicians informed that it may take two days to remove the landslide debris since the task demands higher level of precaution and safety measures.

With the disruption of highway, the containers on the way to Nepal from China have been stranded off the road in Timure region.

Publish Date : 05 January 2022 14:54 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

People’s representatives should be responsible for public service: Prachanda

DAMAULI: CPN (Maoist Centre) Chairperson and former Prime Minister Pushpa

Minister Yadav directs smooth distribution of Melamchi Water in Kathmandu

KATHMANDU: Minister for Water Supply, Pradip Yadav, has instructed daily

NC to discuss current economic situation and way forward

KATHMANDU: The Nepali Congress is to hold a discussion on

Private medical colleges, govt. hospitals directed to make service fees public

KATHMANDU: The Ministry of Health and Population has asked the