Saturday, May 9th, 2026

Ice wall at Japan’s Fukushima Daiichi plant appears partly melted



TOKYO: Tokyo Electric Power Co (Tepco) plans to begin renovation works at the Fukushima Daiichi nuclear power plant, after finding that a frozen wall designed to stem the flow of groundwater around the reactor appears to be partly melted, media reported on Friday.

According to the NHK broadcaster, Tepco intends to launch repair works to strengthen the ice wall in December.

The operator will reportedly install steel pipes and boards to halt the flow of water. Tepco is also considering further steps to prevent such incidents in future, NHK said.

The ice wall was designed by Tepco in 2016 to prevent the pollution of groundwater around the buildings of the disabled nuclear reactor power plant and to prevent its inflow into the frozen soil.

The Fukushima Daiichi nuclear power facility experienced core meltdowns as a result of the earthquake and tsunami on March 11, 2011.

The 2011 accident was the worst at a nuclear power plant since the Chernobyl accident a quarter of a century earlier. As a result of the disaster, 19,749 people died, 6,242 were injured, and 2,556 went missing. (ANI/Sputnik)

Publish Date : 26 November 2021 20:37 PM

Govt seeks applications for National Cooperative Regulatory Authority posts

KATHMANDU: The government has invited applications for the posts of

Over 15,000 displaced as govt’s squatter eviction drive expands across Kathmandu Valley

KATHMANDU: Thousands of people have been displaced after the government

Over 2,000 drivers penalized in Kathmandu Valley in a single day

KATHMANDU: Kathmandu Valley Traffic Police Office has said that 2,034

Hajj pilgrims from Nepal bid farewell for journey to Makkah

KATHMANDU: Nepali Muslim pilgrims departing for the annual Hajj pilgrimage

RSP launches parliamentary and leadership training for lawmakers

KATHMANDU: Rastriya Swatantra Party has launched a parliamentary practice and